Article

How much a website costs in Almaty in 2026

1 July 202620 min read
Amirzhan Tazhin
Amirzhan Tazhin

Director, Tochka KZ

“How much does a site cost?” is a question a lot like “how much does a car cost”: it depends on whether you need a one-pager for an ad campaign or an online store with thousands of products. Let's go through the real prices on the Almaty market for 2026.

What a site's cost is made of

The price of a site is not “a programmer typing code.” It includes design (UX/UI), markup and programming, CMS setup, basic SEO optimization and testing on different devices. The more unique screens and the more complex the logic, the higher the cost.

Landing page — from 95,000 ₸

A one-page site for a specific product or ad campaign. Usually 5–7 screens: offer, benefits, case studies, request form. Development time — 5–10 working days. Suitable for testing demand and collecting requests from targeted advertising.

Corporate site — from 150,000 ₸

A company's multi-page site: service catalog, blog, team and case study pages, a CMS for self-editing. Timeline — 15–25 working days. This is the most popular format for medium business in Kazakhstan.

Need help?

It is not always easy to figure out every nuance on your own. Tell us about your task — we will help find a solution and take care of the technical part.

Discuss your task

Online store — from 350,000 ₸

A catalog with filters, cart, online payment (Kaspi, Halyk, Visa), personal account, 1C integration for stock synchronization. Timeline — from 30 working days. The final price depends heavily on the number of products and the complexity of warehouse integrations.

What affects the final price

Custom design versus a template, the number of language versions, the complexity of integrations (CRM, 1C, payment systems), the volume of content to be moved, and deadlines — if you need a site “yesterday,” that also shows in the cost.

Hidden costs that are forgotten

Hosting and the domain are a separate expense item, usually from 15,000 ₸ a year. After launch the site needs technical support — security updates, backups, small edits. And a separate question is traffic: a site without promotion doesn't bring requests by itself, even if it is perfectly made technically.

How we calculate the cost

We name a fixed price in the contract before work starts — without extra charges “for additional edits” along the way. A detailed breakdown of the plans and what each includes is on the page website development.

How much a site costs: a summary table by type and timeline

There is no single price for a site, because the notion of a “site” unites completely different projects: a one-page business card and a portal with personal accounts are separated by orders of magnitude in cost and timeline. Nevertheless, stable benchmarks have formed in Almaty for standard tasks, and knowing them helps assess offers and not overpay. Below are the main project categories with realistic timelines and starting prices.

Website development cost and timelines in Almaty in 2026
Website development cost and timelines in Almaty in 2026
Site typeBudget fromTimelineTypical composition
Landing page95 000 ₸5–10 working daysUp to 7 sections, request form, responsive design, basic SEO
Business-card site120 000 ₸2–3 weeks3–7 pages, contacts, map, forms
Corporate site150 000 ₸4–8 weeks10–30 pages, custom design, blog, CRM integration
Online store350 000 ₸8–14 weeksCatalog, cart, online payment, delivery
Portal or service with a personal accountfrom 700,000 ₸12–30 weeksRoles, business logic, integrations

Tochka KZ guidelines; the final price is determined after the brief and technical specification.

These figures don't include the costs of hosting, domain, licenses for paid extensions and promotion. They cover the team's work to create the site and launch it on your access. If a contractor offers a price noticeably below the lower bound, most likely it is a ready template without individual work or hidden extra payments.

What an estimate is made of: a sample calculation for a corporate site

To understand what the client is paying for, it is useful to break an estimate down by items. Below is an illustrative example of a 15-page corporate site with custom design and CRM connection. Real figures depend on complexity, but the proportions between stages are quite typical for most projects.

Sample estimate for a 15-page corporate site
Sample estimate for a 15-page corporate site
ArticleCostShare of the estimate
Analytics and technical specification20 000 ₸7 %
Design layouts70 000 ₸26 %
Responsive markup50 000 ₸19 %
Setting up the management system and admin panel60 000 ₸22 %
Forms and CRM integration25 000 ₸9 %
SEO setup15 000 ₸6 %
Filling with content15 000 ₸6 %
Testing and launch15 000 ₸5 %
Total270 000 ₸100 %

The example is illustrative; in a real project the composition and prices are clarified.

It's clear that almost half the budget goes on design and markup, that is, on everything the visitor sees. Another third goes on system setup and integrations that make the site a working tool. The analytics and testing stages seem modest in cost, but they determine whether the result matches expectations.

Why offers differ several times over

Clients are often surprised to receive offers from different studios with a three-to-five-fold difference for an apparently identical assignment. There are several reasons. First, contractors understand the scope differently: one includes custom design, another a template. Second, team composition and overheads differ: a freelancer works cheaper than a studio but bears more risks. Third, some include training, warranty and support in the price, while others treat all this as separate services.

  • Custom design or a ready template with minimal edits.
  • A ready management system or development from scratch.
  • Whether content filling, SEO setup and employee training are included.
  • The size of the warranty and terms of free fixes after launch.
  • The team's qualification and experience in your industry.
  • A fixed price or hourly payment with the risk of exceeding the budget.

To compare offers correctly, ask each contractor to break the estimate down by items and state what is not included in the price. Such a document immediately shows where the difference is hidden. More about choosing — in the article “How to order a website in Kazakhstan: action plan and tips”.

How much a site costs in the first year including all expenses

Website expenses in the first year
Website expenses in the first year
Expense itemBenchmarkFrequency
Corporate site developmentfrom 150,000 ₸One-off
Domainby the registrar's rateAnnually
Hostingby the provider's rateAnnually
SSL certificateOften free, paid options by rateAnnually
Technical support (“Basic” plan)from 360,000 ₸ per yearMonthly, from 30,000 ₸
Search promotionfrom 960,000 ₸ per yearMonthly, from 80,000 ₸

Promotion is optional, but without it a site rarely brings requests.

Many count only the development cost and then are surprised by additional expenses. The real first-year budget usually exceeds the price of creating the site by 2–3 times if you include support and promotion. This is normal: a site is not a one-off purchase but a working tool that requires support and development. Read more about maintenance on the page website support services.

How to save without losing quality

  1. Define a minimal set of functions and launch the site in a reduced form, adding the rest later.
  2. Prepare texts and images in advance: delays with content raise timelines and cost.
  3. Choose a proven platform with many specialists so that customizations aren't expensive.
  4. Approve the design in stages to avoid rework after markup.
  5. Don't order “for the future” functions you won't use in the next year.
  6. Agree on support right away so as not to pay for urgent fixes at an increased rate.

The most expensive saving is giving up analytics and the technical specification. At the description stage mistakes are fixed almost for free, and after launch every change costs a lot. If you're not sure about the budget, order an initial consultation: it will help determine real needs and avoid unnecessary spending.

Fixed price or hourly payment

Contractors work under two main models. With a fixed price, the cost and composition of work are agreed before the start, and the client knows the final sum in advance. This is convenient for projects with a clear assignment but requires a detailed technical specification: any change of requirements is treated as additional work. With hourly payment the client pays for the time actually spent. This model is more flexible, but the budget stays uncertain, and regular reports and limits for each stage are needed for control.

In practice a combined approach works best: the main scope is fixed by an estimate, while unforeseen customizations are paid at an agreed rate after a preliminary estimate. This way both sides are protected from extremes: the contractor doesn't work for free on a growing assignment, and the client doesn't get a bill they didn't expect. Be sure to clarify whether VAT is included in the price and record it in the contract.

Platform and cost: where to save and where you can't

The choice of platform noticeably affects the budget. Builders and ready templates let you launch a site cheaply but limit development. Popular management systems give a balance of price and flexibility. Custom development costs more but imposes no limitations. Saving on the platform is sensible if the site is a temporary tool, for example a page for a promotion. For a site that has to work for years and develop, a cheap start can turn into an expensive rebuild in a year.

How the platform affects the site budget
How the platform affects the site budget
PlatformDevelopment budget fromTimelineFor which tasks
Builder (for example Tilda)95 000 ₸1–3 weeksLanding pages, business cards, quick idea tests
WordPress150 000 ₸3–6 weeksCorporate sites and small stores
1C-Bitrix350 000 ₸6–12 weeksStores with exchange with 1C, complex catalogs
Custom development700 000 ₸10–24 weeksNon-standard logic and services

Tochka KZ guidelines for projects of 10–30 pages.

How much customizations after launch cost

Launching a site is not the end of expenses. The business develops, and the site needs adjusting: changing texts, adding sections, connecting new services. The cost of such work depends on the platform and the quality of the source code. On a neatly made site a standard customization takes a few hours, on a tangled one several times more. So when choosing a contractor ask not only the cost of creation but also the hourly rate and how the project handover is organized.

  • Edits of texts and images are included in the support plan: up to an hour a month on the “Basic” plan and up to four hours on “Standard.”
  • New sections and pages are estimated separately and usually take from one to five working days.
  • Integrations with CRM, payment and the accounting system are separate projects with a timeline of one to six weeks.
  • A major redesign is equated in labor to creating a new site.

Set aside in the first-year budget at least 10–15% of the development cost for customizations and development. These are not mandatory expenses, but almost every site that brings the business results requires investment after launch.

Five questions for the contractor before signing the contract

  • What exactly is included in the price and what will need to be paid separately?
  • Who owns the rights to the design, code and materials after full payment?
  • What are the timelines and how do they change if we delay approvals or materials?
  • What is the warranty and how quickly do you fix errors after launch?
  • How much does support cost and can it be ordered on the same terms?

Honest and specific answers to these questions say more about a contractor than a portfolio. If some answers are vague, it is better to spend another week on choosing than to argue later about what was in the agreements. You can calculate your project's budget on the page website development services.

What affects the cost most

If you break project costs down into factors, three of them explain most of the price difference. The first is the individuality of the design: unique layouts with illustrations and animation cost several times more than adapting a ready template. The second is the volume and complexity of functions: a catalog with filters, a personal account, a calculator and integrations require programming, not just markup. The third is the deadline: rush projects are done by a team in parallel and cost more, so plan the schedule in advance and don't ask to “make it by Monday.”

  • Number of unique page types: each new template adds design and markup.
  • Number of languages and regional versions.
  • Number of integrations with external systems.
  • Requirements for speed, security and load.
  • Volume of content to prepare, move or translate.

When you understand which factors raise the price, it's easier to make decisions about priorities. Sometimes giving up one non-standard function in the first version cuts the budget by a fifth, and it can be added later when the site starts to bring profit.

How to write a brief to get an accurate estimate

The more detailed the brief, the more accurate the estimate. Describe the site's goals, the composition of sections, needed functions, integrations, examples of sites you like, deadlines and desired budget. The contractor will be able to assess the scope of work without big allowances, and you will be able to compare offers on equal terms.

How much a site costs for different industries

The cost of a site depends not only on technical parameters but on the business's specifics. A clinic needs online booking, doctor pages and a service catalog with prices; a manufacturing company — a product catalog and commercial offer request forms; an online store — product pages, filters and payment; a law firm — practice pages and case studies. Each set of functions affects the scope of design and development. Below are benchmarks for typical combinations found in projects by companies from Almaty and other cities of Kazakhstan.

Typical sites by industry and their approximate budget
Typical sites by industry and their approximate budget
IndustryTypical set of functionsBudget fromTimeline
Clinic or salonServices with prices, specialist pages, online booking, reviews250 000 ₸6–10 weeks
Manufacturing companyProduct catalog, price request forms, certificates, case studies200 000 ₸5–9 weeks
Trading companyCatalog, filters, requests, integration with the accounting system350 000 ₸8–14 weeks
Legal and consulting servicesPractices, team, case studies, blog, consultation forms150 000 ₸4–7 weeks
Educational centerCourses, schedule, online requests, personal account300 000 ₸8–14 weeks
Construction companyPortfolio of projects, calculator, service catalog, request form200 000 ₸5–9 weeks

Tochka KZ guidelines for projects with custom design; an exact calculation — after the brief.

These figures show that the same number of pages can cost differently. If the site has online booking or a calculator, it is separate development with its own logic and testing. So before requesting commercial proposals, draw up a list of functions, not just a list of pages.

Calculation example: a site for a dental clinic

To see how the budget forms, let's go through a hypothetical project: a clinic site of 20 pages with a description of services, doctor pages, prices, a booking form and CRM integration. The design is made individually, the text and photos are prepared by the clinic. Below is an approximate estimate showing the proportions of costs. In a real project the figures will depend on the scope and requirements.

Sample estimate for a 20-page clinic site
Sample estimate for a 20-page clinic site
WorkCostComment
Analytics and structure30 000 ₸Description of services, roles, booking scenarios
Design of the home page and 4 types of inner pages100 000 ₸Layouts for computer and phone
Responsive markup70 000 ₸Templates of all page types
Platform and admin setup70 000 ₸Services, doctors, prices, reviews are edited without a developer
Online booking and CRM integration60 000 ₸Booking form, data transfer, notifications
SEO setup and analytics30 000 ₸Headings, addresses, goals, sitemap
Filling and testing40 000 ₸Transferring texts and photos, checking
Total400 000 ₸Without hosting, domain and promotion

The example is illustrative; amounts depend on the project's complexity.

It's clear that almost a quarter of the budget goes on design, and the online booking function adds a noticeable amount. If the clinic is ready at the first stage to forgo integration and take requests by phone and messenger, the cost falls by about 15 percent, and booking can be added later.

Contract, payment and work procedure

Payment terms affect the project's safety. A typical scheme is a 30–50 percent prepayment before work starts, payment by stages as they are accepted and a final settlement after launch. Full prepayment without stages raises the risk, while payment only at the end doesn't please the contractor. A sensible balance protects both sides. The contract should state what is included in the price, how changes are formalized and who owns the rights to the result.

  • Clarify whether VAT is included in the price and request closing documents.
  • Fix the list of pages and functions in an appendix to the contract.
  • Define the period of free fixes after launch, usually 1 to 3 months.
  • Agree on the procedure for handing over the source code, design files and access.
  • Agree on support: from 30,000 ₸ a month on the “Basic” plan.

These points take less than a page of text but protect against most disputes. Don't hesitate to discuss them in advance: a reliable contractor will take the questions as a sign of a serious approach.

When saving on a site turns into costs

The wish to save is understandable, but saving has limits. A site that is too cheap usually means a ready template without customization, no analytics and SEO, a weak mobile version and no support. In a year the owner understands the site brings no requests and orders a new one, having spent the money twice. So it is useful to ask yourself: how many requests should the site bring and how much are you willing to pay per request?

If a site should bring 20 or more requests a month at an average profit per customer of 50,000 ₸, it creates a million tenge of gross profit monthly, and an investment of 300–500 thousand will pay off quickly. If, however, the site is needed as a formality, it's sensible to limit yourself to a simple solution. Evaluate the project through the expected return, not only through the price, and make decisions based on numbers.

How to calculate the budget in advance and not exceed it

A simple way to control the budget is to set aside a reserve of 10–15 percent for unforeseen tasks, which almost always appear along the way. Fix the estimate by stages, pay for work after acceptance of each stage and agree on the procedure for assessing new requirements. Then the final sum stays predictable, and you don't risk facing a choice between an unfinished site and an unexpected bill.

Free consultation

Tell us about your task — we'll find a solution

We reply within 15 minutes during business hours.

CallWhatsApp